Five service lines.
One operations team.

Parking lot sweeping
Day & night sweeping operations
WEEKLY BI-WEEKLY MONTHLY ON-CALL
S/01 Day & night sweeping operations

Parking lot sweeping

Mechanical sweeping and hand-detail crews keep parking lots presentable, code-compliant, and inspection-ready across every site in the portfolio.

SCOPE
  • Mechanical broom & truck sweeping
  • Hand-detail of curb lines, islands, and entry approaches
  • Trash, debris, and bulk-pickup haul-off
  • Storm-drain & catch-basin clearing on request
  • Storefront sidewalk blow-down
DELIVERABLES
  • Photo log, time-stamped per site
  • Geo-tagged route record
  • Exception report (illegal dumping, vandalism, and hazards)
CADENCE

Standard cadences: weekly, bi-weekly, monthly. After-hours & overnight available on routes.

Request a scope for this line
Line striping & lot markings
Striping, signage & ADA compliance
ADA · COMPLIANT FIRE LANES STENCIL FULL LAYOUT
S/02 Striping, signage & ADA compliance

Line striping & lot markings

Re-stripes, full layouts, and stencil work — done to spec and documented for compliance, not just for looks.

SCOPE
  • Strikes of existing layouts (single, double, hairpin)
  • Full lot layouts with engineered drawings
  • ADA stalls & access aisles to current standards
  • Fire lane painting and curb work
  • Custom stencils (numbering, EV, reserved, directional)
DELIVERABLES
  • Before / after photo set per site. Aerial photos upon request
  • Stall count & ADA ratio recorded
  • Paint spec sheet (latex / acrylic / thermo)
CADENCE

Most portfolios run on a 24-month cycle for strikes. ADA audits scheduled annually.

Request a scope for this line
Asphalt repair & sealcoat
Patch, seal, mill & overlay
PATCH SEAL CRACK FILL OVERLAY
S/03 Patch, seal, mill & overlay

Asphalt repair & sealcoat

Patch a pothole before it becomes a claim. Sealcoat before the lot needs an overlay. Overlay before the base fails.

SCOPE
  • Cold & hot patch for potholes and utility cuts
  • Crack filling (hot rubberized)
  • Sealcoat application — squeegee or spray
  • Mill & overlay coordination with paving partners
  • Concrete spot repair (curbs, aprons, ADA pads)
DELIVERABLES
  • Condition assessment with severity rating
  • Square-footage tally per defect type
  • Recommended remediation cycle
CADENCE

Crack fill annually. Sealcoat every 3–5 years depending on traffic & exposure.

Request a scope for this line
Lot inspections & reporting
Photo documentation, every visit
PHOTO LOG GEO-TAG REPORT PORTAL
S/04 Photo documentation, every visit

Lot inspections & reporting

The reporting is the product. Every visit, every site — time-stamped photos, geo-tagged routes, exception flagging that drops straight into your portal.

SCOPE
  • Routine condition inspection, scope-tagged
  • Trip-hazard, ponding, and lighting flags
  • Trash-receptacle & bollard inventory
  • Striping & signage condition scoring
  • Storm-event after-action surveys
DELIVERABLES
  • Monthly portfolio report (PDF)
  • Per-site exception ticket with photos
  • Yardi / MRI / RealPage portal upload
CADENCE

Default monthly. Weekly on high-traffic class A. Storm surveys within 24h of event.

Request a scope for this line
Seasonal services
Snow, ice, leaf & storm
SNOW ICE LEAVES STORM
S/05 Snow, ice, leaf & storm

Seasonal services

After storm cleanup of salt, gathered trash and leaf removal. Handled without negotiating scope every quarter.

SCOPE
  • Plowing (lots, drives, fire lanes)
  • Pre-treat, salting, and de-icing
  • Sidewalk clearing & ice melt
  • Fall leaf removal & mechanical pickup
  • Post-storm debris clearing
DELIVERABLES
  • Per-event service ticket
  • Salt-application weight log
  • Weather-trigger documentation
CADENCE

Seasonal contracts (Nov–Mar / Oct–Dec). 24/7 dispatch during declared events.

Request a scope for this line

Tell us the portfolio. We'll scope the routes.

Send a site list — addresses, square footage, current cadence — and we’ll come back with a coverage plan and price.